IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

83

matching recommendations
Reset
NAICS 339 Miscellaneous Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0342 # 08 Y:2012 08 2012 REPAIR OR REPLACE STEAM TRAPS $1,008 $675 Implemented
LE0342 # 09 Y:2012 09 2012 REPLACE BOILER $225,837 $230,000 Implemented
LE0342 # 10 Y:2012 10 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,462 $10,000 Not Implemented
LE0342 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,433 $40,000 Implemented
LE0342 # 05 Y:2012 05 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,149 $48,500 Not Implemented
LE0342 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,070 $1,000 Not Implemented
LE0342 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,098 $1,800 Not Implemented
LE0342 # 14 Y:2012 14 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,722 $85,000 Implemented
LE0342 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,151 $17,500 Implemented
LE0342 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $220 $925 Not Implemented
LE0342 # 11 Y:2012 11 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $601,021 $1,280,000 Not Implemented
LE0342 # 12 Y:2012 12 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $22,316 $58,200 Not Implemented
DL0016 # 09 Y:2008 09 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $15,600 $600,000 Not Implemented
DL0016 # 08 Y:2008 08 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,540 $125,000 Not Implemented
DL0016 # 07 Y:2008 07 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $24 $2,394 Implemented
DL0016 # 06 Y:2008 06 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $635 $160 Not Implemented
DL0016 # 01 Y:2008 01 2008 UPGRADE CONTROLS ON COMPRESSORS $19,500 $1,000 Not Implemented
DL0016 # 02 Y:2008 02 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $12,550 $0 Implemented
DL0016 # 03 Y:2008 03 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,172 $700 Not Implemented
DL0016 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $3,343 $590 Implemented
DL0016 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,304 $500 Not Implemented
LE0198 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,443 $24,000 Implemented
LE0198 # 01 Y:2004 01 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,168 $76,950 n/a
LE0198 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $566 Implemented
LE0198 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,500 $2,500 Implemented