IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0033 # 10 Y:1985 10 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,126 $1,770 Not Implemented
ST0033 # 11 Y:1985 11 1985 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $4,383 $87 Not Implemented
ST0033 # 12 Y:1985 12 1985 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $384 $0 Implemented
ST0033 # 13 Y:1985 13 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $39,416 $45,000 Not Implemented
ST0026 # 01 Y:1985 01 1985 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $292 $60 Not Implemented
ST0026 # 02 Y:1985 02 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,867 $40 Not Implemented
ST0026 # 03 Y:1985 03 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $607 $0 Not Implemented
ST0026 # 04 Y:1985 04 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $706 $1,700 Not Implemented
ST0026 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $29,188 $16,200 Not Implemented
ST0026 # 06 Y:1985 06 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $6,181 $0 Not Implemented
ST0026 # 07 Y:1985 07 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,096 $400 Not Implemented
ST0026 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $712 $537 Not Implemented
ST0026 # 09 Y:1985 09 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $682 Not Implemented
ST0026 # 10 Y:1985 10 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $155 $450 Not Implemented
ST0018 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,967 $2,258 Not Implemented
ST0018 # 02 Y:1985 02 1985 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $679 $0 Implemented
ST0018 # 03 Y:1985 03 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $533 $750 Not Implemented
ST0018 # 04 Y:1985 04 1985 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $200 $100 Not Implemented
ST0018 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,502 $453 Implemented
ST0018 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,390 $1,900 Implemented
ST0018 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,356 $128 Implemented
ST0018 # 08 Y:1985 08 1985 INSTALL AUTOMATIC STACK DAMPER $2,670 $1,350 Not Implemented
ST0018 # 09 Y:1985 09 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,038 $537 Implemented
ST0018 # 10 Y:1985 10 1985 INSULATE BARE EQUIPMENT $599 $1,263 Implemented
ST0018 # 11 Y:1985 11 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $502 $100 Not Implemented