Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
47
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0169 # 01 Y:2016 | 01 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $163,600 | $12,000 | Not Implemented |
DL0169 # 02 Y:2016 | 02 | 2016 | KEEP EQUIPMENT CLEAN | $13,120 | $2,500 | Implemented |
DL0169 # 03 Y:2016 | 03 | 2016 | ADJUST BURNERS FOR EFFICIENT OPERATION | $117,000 | $34,000 | Not Implemented |
DL0169 # 04 Y:2016 | 04 | 2016 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $5,060 | $5,000 | Not Implemented |
DL0169 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $11,160 | $11,160 | Not Implemented |
DL0169 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $300,500 | $1,937,040 | Not Implemented |
LE0426 # 04 Y:2016 | 04 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,322 | $780 | Implemented |
LE0426 # 05 Y:2016 | 05 | 2016 | INSTALL OCCUPANCY SENSORS | $3,070 | $3,000 | Not Implemented |
LE0426 # 01 Y:2016 | 01 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $13,840 | $1,000 | Implemented |
LE0426 # 06 Y:2016 | 06 | 2016 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $16,120 | $35,000 | Not Implemented |
LE0426 # 09 Y:2016 | 09 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,579 | $13,747 | Implemented |
LE0426 # 10 Y:2016 | 10 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $179 | $780 | Implemented |
LE0426 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,376 | $16,500 | Not Implemented |
LE0426 # 11 Y:2016 | 11 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,435 | $12,000 | Implemented |
LE0426 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $454 | $1,300 | Not Implemented |
LE0426 # 02 Y:2016 | 02 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,562 | $2,000 | Implemented |
LE0426 # 03 Y:2016 | 03 | 2016 | REDUCE VENTILATION AIR | $102,120 | $52,500 | Not Implemented |
DL0166 # 09 Y:2016 | 09 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,467 | $565 | Not Implemented |
DL0166 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $2,400 | $3,900 | Not Implemented |
DL0166 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,810 | $35,710 | Not Implemented |
DL0166 # 06 Y:2016 | 06 | 2016 | ADD AREA LIGHTING SWITCHES | $1,520 | $910 | Not Implemented |
DL0166 # 05 Y:2016 | 05 | 2016 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $18,930 | $4,739 | Not Implemented |
DL0166 # 04 Y:2016 | 04 | 2016 | USE RADIANT HEATER FOR SPOT HEATING | $1,310 | $2,990 | Not Implemented |
DL0166 # 03 Y:2016 | 03 | 2016 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $3,496 | $9,820 | Not Implemented |
DL0166 # 02 Y:2016 | 02 | 2016 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,815 | $27,020 | Not Implemented |