IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0169 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $163,600 $12,000 Not Implemented
DL0169 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $13,120 $2,500 Implemented
DL0169 # 03 Y:2016 03 2016 ADJUST BURNERS FOR EFFICIENT OPERATION $117,000 $34,000 Not Implemented
DL0169 # 04 Y:2016 04 2016 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $5,060 $5,000 Not Implemented
DL0169 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $11,160 $11,160 Not Implemented
DL0169 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $300,500 $1,937,040 Not Implemented
LE0426 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $780 Implemented
LE0426 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $3,070 $3,000 Not Implemented
LE0426 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,840 $1,000 Implemented
LE0426 # 06 Y:2016 06 2016 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $16,120 $35,000 Not Implemented
LE0426 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,579 $13,747 Implemented
LE0426 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $179 $780 Implemented
LE0426 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,376 $16,500 Not Implemented
LE0426 # 11 Y:2016 11 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,435 $12,000 Implemented
LE0426 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $454 $1,300 Not Implemented
LE0426 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,562 $2,000 Implemented
LE0426 # 03 Y:2016 03 2016 REDUCE VENTILATION AIR $102,120 $52,500 Not Implemented
DL0166 # 09 Y:2016 09 2016 UPGRADE CONTROLS ON COMPRESSORS $1,467 $565 Not Implemented
DL0166 # 08 Y:2016 08 2016 INSTALL OCCUPANCY SENSORS $2,400 $3,900 Not Implemented
DL0166 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,810 $35,710 Not Implemented
DL0166 # 06 Y:2016 06 2016 ADD AREA LIGHTING SWITCHES $1,520 $910 Not Implemented
DL0166 # 05 Y:2016 05 2016 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $18,930 $4,739 Not Implemented
DL0166 # 04 Y:2016 04 2016 USE RADIANT HEATER FOR SPOT HEATING $1,310 $2,990 Not Implemented
DL0166 # 03 Y:2016 03 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $3,496 $9,820 Not Implemented
DL0166 # 02 Y:2016 02 2016 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,815 $27,020 Not Implemented