IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0397 # 06 Y:2015 06 2015 UPGRADE OBSOLETE EQUIPMENT $151 $330 Implemented
SU0397 # 05 Y:2015 05 2015 ELIMINATE/REDUCE AN OPERATION $584 $1,190 Not Implemented
SU0397 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $573 Not Implemented
SU0397 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,078 $16,120 Not Implemented
SU0397 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,191 $1,220 Implemented
SU0397 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $630 $552 Implemented
SU0395 # 01 Y:2015 01 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,070 $3,930 Not Implemented
SU0395 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $86 Implemented
SU0395 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,174 $1,020 Implemented
SU0395 # 04 Y:2015 04 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,740 $7,476 Implemented
SU0395 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $66 $132 Not Implemented
SU0395 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,804 $9,736 Not Implemented
SU0243 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $186 $428 Implemented
SU0243 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $382 $912 Implemented
SU0243 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,436 $104,800 Not Implemented
SU0243 # 11 Y:2006 11 2006 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $23,312 $73,075 Not Implemented
SU0243 # 07 Y:2006 07 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $438 $732 Not Implemented
SU0243 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,352 $1,344 Implemented
SU0243 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $13,094 $636 Implemented
SU0243 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $1,147 $0 Implemented
SU0243 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,730 $0 Not Implemented
SU0243 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,394 $0 Implemented
SU0243 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,077 $0 Implemented
SU0216 # 01 Y:2005 01 2005 UPGRADE OBSOLETE EQUIPMENT $3,046 $0 Not Implemented
SU0216 # 02 Y:2005 02 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $0 Implemented