IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

61

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0359 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,476 $4,124 Implemented
SU0359 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $931 $855 Implemented
SU0359 # 03 Y:2014 03 2014 INSTALL OCCUPANCY SENSORS $1,346 $470 Implemented
SU0359 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,651 $1,900 Implemented
SU0359 # 01 Y:2014 01 2014 INSULATE FEEDWATER TANK $1,037 $137 Implemented
SU0339 # 09 Y:2013 09 2013 ELIMINATE/REDUCE AN OPERATION $13,535 $19,680 Implemented
SU0339 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $2,294 $2,093 Implemented
SU0339 # 05 Y:2013 05 2013 ADD AREA LIGHTING SWITCHES $429 $152 Implemented
SU0339 # 04 Y:2013 04 2013 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $18,079 $3,600 Implemented
SU0339 # 03 Y:2013 03 2013 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,064 $125 Implemented
SU0339 # 01 Y:2013 01 2013 INSTALL SPECTRAL REFLECTORS / DELAMP $4,610 $0 Implemented
SU0319 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,410 $2,500 Implemented
SU0319 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $24,117 $15,840 Implemented
SU0319 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,147 $1,075 Implemented
SU0319 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $250,480 $603,880 Implemented
SU0294 # 10 Y:2010 10 2010 UPGRADE OBSOLETE EQUIPMENT $276 $1,831 Implemented
SU0294 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $817 Implemented
SU0294 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $492 Implemented
SU0294 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,763 $1,440 Implemented
SU0294 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,276 $0 Implemented
SU0294 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,067 $0 Implemented
SU0289 # 03 Y:2010 03 2010 $1,552 $0 Implemented
SU0289 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,573 $0 Implemented
SU0289 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $1,653 $1,236 Implemented
SU0289 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,383 $578 Implemented