IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0251 # 10 Y:2007 10 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $278 $130 Not Implemented
SU0251 # 11 Y:2007 11 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $234 $150 Not Implemented
SU0251 # 12 Y:2007 12 2007 INSTALL OCCUPANCY SENSORS $1,778 $1,620 Not Implemented
SU0251 # 13 Y:2007 13 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,970 $2,556 Implemented
SU0251 # 14 Y:2007 14 2007 OPTIMIZE PLANT POWER FACTOR $3,906 $14,129 Not Implemented
MA0590 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,037 $56,931 Implemented
MA0590 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,269 $30,445 Not Implemented
MA0590 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,393 $12,255 Not Implemented
MA0590 # 04 Y:2006 04 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $3,295 Not Implemented
MA0590 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,630 $7,000 Not Implemented
MA0590 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,603 $3,312 Implemented
MA0590 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $1,000 Implemented
MA0590 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $29,100 $25,000 Not Implemented
MA0590 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $10,500 $2,000 Implemented
MA0590 # 10 Y:2006 10 2006 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $9,818 $6,420 Implemented
MA0590 # 11 Y:2006 11 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,286 $21,300 Not Implemented
SU0207 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $206 $0 Implemented
SU0207 # 02 Y:2005 02 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,133 $0 Not Implemented
SU0207 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,791 $477 Implemented
SU0207 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $2,489 $2,000 Not Implemented
SU0207 # 05 Y:2005 05 2005 ADJUST VENTS TO MINIMIZE ENERGY USE $21,600 $21,422 Not Implemented
SU0207 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $55 $92 Implemented
SU0199 # 01 Y:2005 01 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $144 $0 Implemented
SU0199 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,830 $0 Not Implemented
SU0199 # 03 Y:2005 03 2005 $371,280 $13,500 Implemented