IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0119 # 07 Y:2001 07 2001 $2,456 $0 Implemented
SU0119 # 06 Y:2001 06 2001 $46,417 $15,500 Not Implemented
SU0119 # 05 Y:2001 05 2001 INSULATE BARE EQUIPMENT $30,661 $208,950 Not Implemented
SU0119 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $2,095 $727 Implemented
SU0119 # 03 Y:2001 03 2001 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,956 $4,900 Implemented
SU0119 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $930 $0 Implemented
SU0119 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,410 $0 Not Implemented
SU0118 # 04 Y:2001 04 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,469 $16,370 Not Implemented
SU0118 # 05 Y:2001 05 2001 $20,861 $0 Not Implemented
SU0118 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $120 $158 Not Implemented
SU0118 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $392 $0 Implemented
SU0118 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,949 $30 Not Implemented
SU0106 # 01 Y:2001 01 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,051 $0 Implemented
SU0106 # 05 Y:2001 05 2001 OPTIMIZE PLANT POWER FACTOR $3,243 $10,210 Implemented
SU0106 # 04 Y:2001 04 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,158 $500 Implemented
SU0106 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,947 $2,241 Not Implemented
SU0106 # 02 Y:2001 02 2001 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $399,407 $1,400,000 Not Implemented