IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0165 # 07 Y:2003 07 2003 UPGRADE CONTROLS ON COMPRESSORS $93,620 $94,691 Implemented
SU0165 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,763 $5,538 Not Implemented
SU0165 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $9,177 $20,736 Not Implemented
SU0165 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,503 $937 Implemented
SU0165 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,370 $17,064 Implemented
SU0165 # 02 Y:2003 02 2003 RECOVER AND REUSE SPENT ACID BATHS $30,138 $3,234 Implemented
SU0165 # 01 Y:2003 01 2003 $99,450 $110,400 Implemented
SU0158 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152,410 $301,250 Not Implemented
SU0158 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,432 $0 Implemented
SU0158 # 06 Y:2003 06 2003 USE SYNTHETIC LUBRICANT $10,573 $1,000 Implemented
SU0158 # 01 Y:2003 01 2003 REPAIR OR REPLACE STEAM TRAPS $161,780 $4,536 Implemented
SU0158 # 09 Y:2003 09 2003 $5,056 $0 Implemented
SU0158 # 08 Y:2003 08 2003 RECOVER AND REUSE SPENT ACID BATHS $7,052 $6,521 Not Implemented
SU0158 # 05 Y:2003 05 2003 OPTIMIZE PLANT POWER FACTOR $24,189 $70,275 Not Implemented
SU0158 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $67,325 $5,200 Implemented
SU0158 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $95,164 $235,000 Not Implemented
SU0158 # 12 Y:2003 12 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,302 $3,256 Not Implemented
SU0158 # 10 Y:2003 10 2003 $4,599 $0 Implemented
SU0158 # 11 Y:2003 11 2003 $2,892 $0 Implemented
SU0160 # 09 Y:2003 09 2003 INSULATE BARE EQUIPMENT $1,997 $3,315 Not Implemented
SU0160 # 08 Y:2003 08 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,145 $12,781 Not Implemented
SU0160 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,587 $0 Not Implemented
SU0160 # 05 Y:2003 05 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $8,492 $4,200 Not Implemented
SU0160 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $16,605 $34,047 Not Implemented
SU0160 # 03 Y:2003 03 2003 RECOVER WASTE HEAT FROM EQUIPMENT $1,336,834 $875,536 Implemented