Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

448

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0195 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,236 $1,380 Implemented
SU0195 # 04 Y:2004 04 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,836 $1,837 Implemented
SU0195 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,140 $555 Implemented
SU0172 # 01 Y:2004 01 2004 $4,883 $0 Implemented
SU0172 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,000 $0 Not Implemented
SU0172 # 03 Y:2004 03 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $515 $0 Implemented
SU0172 # 04 Y:2004 04 2004 $325 $0 Implemented
SU0172 # 05 Y:2004 05 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,426 $120 Implemented
SU0172 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,140 $400 Implemented
SU0172 # 07 Y:2004 07 2004 $31,815 $30,250 Not Implemented
SU0172 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $1,950 $4,508 Not Implemented
SU0159 # 01 Y:2003 01 2003 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,869 $18,122 Not Implemented
SU0159 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,575 $15,750 Not Implemented
SU0159 # 03 Y:2003 03 2003 USE SYNTHETIC LUBRICANT $1,187 $800 Implemented
SU0159 # 04 Y:2003 04 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $0 Implemented
SU0159 # 05 Y:2003 05 2003 REPLACE BOILER $1,148 $13,507 Implemented
SU0159 # 06 Y:2003 06 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,028 $0 Implemented
SU0159 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $276 $523 Implemented
SU0131 # 01 Y:2002 01 2002 CHANGE PRODUCT SPECS $14,930 $2,500 Not Implemented
SU0131 # 02 Y:2002 02 2002 ELIMINATE/REDUCE AN OPERATION $2,391 $115 Not Implemented
SU0131 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $997 $102 Implemented
SU0131 # 04 Y:2002 04 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $917 $115 Not Implemented
SU0131 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $775 $193 Implemented
SU0131 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $197 $0 Not Implemented
SU0127 # 01 Y:2002 01 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,500 $0 Not Implemented