IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

82

matching recommendations
Reset
SIC 384 Medical Instruments And Supplies
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0296 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $793 Not Implemented
SU0296 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $758 $447 Implemented
SU0296 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,753 $554 Not Implemented
SU0296 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,948 $0 Not Implemented
SU0296 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $81,934 $0 Implemented
MA0610 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,053 $49,555 Not Implemented
MA0610 # 02 Y:2007 02 2007 $5,760 $7,600 Implemented
MA0610 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,399 $10,600 Implemented
MA0610 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,743 $4,700 Implemented
MA0610 # 05 Y:2007 05 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,320 $2,782 Not Implemented
MA0610 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $94 $100 Implemented
SU0136 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,332 $107 Not Implemented
SU0136 # 16 Y:2002 16 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $140 $0 Implemented
SU0136 # 15 Y:2002 15 2002 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $196 $60 Not Implemented
SU0136 # 14 Y:2002 14 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $219 $0 Implemented
SU0136 # 13 Y:2002 13 2002 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $379 $5 Implemented
SU0136 # 12 Y:2002 12 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $928 $0 Implemented
SU0136 # 11 Y:2002 11 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $928 $63 Implemented
SU0136 # 01 Y:2002 01 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,000 $0 Not Implemented
SU0136 # 02 Y:2002 02 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,245 $0 Implemented
SU0136 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,526 $270 Not Implemented
SU0136 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,696 $60 Not Implemented
SU0136 # 06 Y:2002 06 2002 REDUCE VENTILATION AIR $1,494 $104 Not Implemented
SU0136 # 10 Y:2002 10 2002 INSULATE BARE EQUIPMENT $1,249 $700 Not Implemented
SU0136 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,569 $0 Not Implemented