IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0229 # 08 Y:2006 08 2006 KEEP BOILER TUBES CLEAN $5,210 $1,534 Implemented
MA0594 # 01 Y:2006 01 2006 INSTALL TIMERS AND/OR THERMOSTATS $123,147 $15,525 Implemented
MA0594 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,354 $121,835 Implemented
MA0594 # 05 Y:2006 05 2006 REDUCE VENTILATION AIR $5,860 $3,505 Implemented
MA0594 # 06 Y:2006 06 2006 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,046 $0 Implemented
SU0227 # 02 Y:2006 02 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $434 $0 Implemented
SU0227 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $629 $228 Implemented
SU0227 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $1,187 Implemented
SU0227 # 11 Y:2006 11 2006 INSTALL OCCUPANCY SENSORS $91 $194 Implemented
MA0590 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $23,037 $56,931 Implemented
MA0590 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $16,603 $3,312 Implemented
MA0590 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,408 $1,000 Implemented
MA0590 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $10,500 $2,000 Implemented
MA0590 # 10 Y:2006 10 2006 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $9,818 $6,420 Implemented
SU0224 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,943 $0 Implemented
SU0224 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,147 $0 Implemented
SU0224 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $3,039 $0 Implemented
SU0224 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,650 $958 Implemented
SU0224 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,340 $825 Implemented
SU0224 # 07 Y:2006 07 2006 KEEP BOILER TUBES CLEAN $2,726 $1,466 Implemented
SU0224 # 08 Y:2006 08 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $79,657 $50,307 Implemented
SU0224 # 09 Y:2006 09 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $43,464 $52,154 Implemented
SU0224 # 10 Y:2006 10 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,736 $14,580 Implemented
SU0224 # 11 Y:2006 11 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $77 $348 Implemented
SU0224 # 12 Y:2006 12 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,037 $11,000 Implemented