Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0175 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $3,201 | $168 | Implemented |
HO0175 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $320 | $500 | Not Implemented |
HO0175 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $800 | $300 | Implemented |
HO0175 # 05 Y:1998 | 05 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $9,375 | $0 | Implemented |
HO0175 # 06 Y:1998 | 06 | 1998 | CLEAR AND RENT EXISTING SPACE | $18,000 | $3,000 | Implemented |
HO0175 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,263 | $16,755 | Implemented |
HO0187 # 02 Y:1998 | 02 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $133 | $415 | Not Implemented |
HO0187 # 06 Y:1998 | 06 | 1998 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $1,125 | $100 | Implemented |
HO0187 # 04 Y:1998 | 04 | 1998 | INSULATE BARE EQUIPMENT | $1,092 | $650 | Not Implemented |
HO0187 # 05 Y:1998 | 05 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $807 | $250 | Implemented |
HO0187 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $267 | $500 | Implemented |
HO0187 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,545 | $90,112 | Not Implemented |
MA0426 # 04 Y:1998 | 04 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $902 | $1,975 | Not Implemented |
MA0426 # 05 Y:1998 | 05 | 1998 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $2,320 | $9,100 | Not Implemented |
MA0426 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $9,368 | $24,200 | Not Implemented |
MA0426 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $623 | $25 | Implemented |
MA0426 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $586 | $458 | Implemented |
MA0425 # 06 Y:1998 | 06 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,093 | $14,700 | Not Implemented |
MA0425 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $91,206 | $104,150 | Not Implemented |
MA0425 # 03 Y:1998 | 03 | 1998 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $264,206 | $700,000 | Not Implemented |
MA0425 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,320 | $1,650 | Not Implemented |
MA0425 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,915 | $160,000 | Not Implemented |
MA0425 # 01 Y:1998 | 01 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,172 | $146,000 | Not Implemented |
MA0415 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $62,915 | $200,000 | Not Implemented |
MA0415 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,748 | $2,019 | Implemented |