Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
249
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0244 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $448 | $356 | Implemented |
SU0244 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,070 | $1,038 | Implemented |
SU0244 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $93,478 | $10,000 | Not Implemented |
SU0244 # 03 Y:2006 | 03 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $38,250 | $1,066 | Not Implemented |
SU0244 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $38,277 | $20,000 | Implemented |
SU0244 # 12 Y:2006 | 12 | 2006 | OPTIMIZE PLANT POWER FACTOR | $11,590 | $30,856 | Not Implemented |
SU0244 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33,798 | $0 | Implemented |
SU0244 # 13 Y:2006 | 13 | 2006 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $1,187,734 | $4,100,000 | Not Implemented |
SU0244 # 09 Y:2006 | 09 | 2006 | INSULATE FEEDWATER TANK | $3,113 | $2,058 | Implemented |
SU0244 # 02 Y:2006 | 02 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $8,145 | $0 | Implemented |
SU0244 # 08 Y:2006 | 08 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,016 | $5,266 | Not Implemented |
SU0244 # 06 Y:2006 | 06 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $16,219 | $432 | Implemented |
SU0244 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,614 | $0 | Not Implemented |
SU0243 # 08 Y:2006 | 08 | 2006 | INSTALL OCCUPANCY SENSORS | $186 | $428 | Implemented |
SU0243 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,394 | $0 | Implemented |
SU0243 # 07 Y:2006 | 07 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $438 | $732 | Not Implemented |
SU0243 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $13,094 | $636 | Implemented |
SU0243 # 01 Y:2006 | 01 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $18,077 | $0 | Implemented |
SU0243 # 11 Y:2006 | 11 | 2006 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $23,312 | $73,075 | Not Implemented |
SU0243 # 04 Y:2006 | 04 | 2006 | USE SYNTHETIC LUBRICANT | $1,147 | $0 | Implemented |
SU0243 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $39,436 | $104,800 | Not Implemented |
SU0243 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,352 | $1,344 | Implemented |
SU0243 # 03 Y:2006 | 03 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,730 | $0 | Not Implemented |
SU0243 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $912 | Implemented |
SU0245 # 15 Y:2006 | 15 | 2006 | OPTIMIZE PLANT POWER FACTOR | $5,643 | $19,001 | Not Implemented |