Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0326 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $148 | $59 | Implemented |
SU0326 # 08 Y:2012 | 08 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $542 | $732 | Not Implemented |
SU0326 # 02 Y:2012 | 02 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,393 | $2,291 | Implemented |
SU0326 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,463 | $0 | Implemented |
SU0326 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $4,743 | $2,736 | Not Implemented |
SU0326 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,280 | $3,077 | Implemented |
SU0326 # 05 Y:2012 | 05 | 2012 | ELIMINATE/REDUCE AN OPERATION | $8,342 | $8,640 | Not Implemented |
SU0326 # 09 Y:2012 | 09 | 2012 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $61,559 | $262,789 | Implemented |
SU0326 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,568 | $7,264 | Not Implemented |
SU0328 # 07 Y:2012 | 07 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $13,560 | $54,280 | Implemented |
SU0328 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,923 | $2,382 | Implemented |
SU0328 # 01 Y:2012 | 01 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $164 | $0 | Implemented |
SU0328 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $678 | $611 | Implemented |
SU0328 # 04 Y:2012 | 04 | 2012 | ELIMINATE/REDUCE AN OPERATION | $4,336 | $4,060 | Not Implemented |
SU0328 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $309 | $758 | Not Implemented |
SU0328 # 02 Y:2012 | 02 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,399 | $1,890 | Not Implemented |
SU0327 # 03 Y:2012 | 03 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $870 | $858 | Implemented |
SU0327 # 02 Y:2012 | 02 | 2012 | PAY BILLS ON TIME TO AVOID LATE FEES | $287 | $0 | Not Implemented |
SU0327 # 01 Y:2012 | 01 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $728 | $0 | Implemented |
SU0327 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $2,247 | $4,271 | Implemented |
SU0325 # 01 Y:2012 | 01 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $46,347 | $5,200 | Not Implemented |
SU0325 # 04 Y:2012 | 04 | 2012 | REDUCE VENTILATION AIR | $1,286 | $5,127 | Not Implemented |
SU0325 # 03 Y:2012 | 03 | 2012 | ELIMINATE/REDUCE AN OPERATION | $24,636 | $20,468 | Implemented |
SU0325 # 05 Y:2012 | 05 | 2012 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,516 | $10,889 | Not Implemented |
SU0325 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $33,105 | $2,640 | Implemented |