IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0501 # 02 Y:2020 02 2020 DISCONNECT BALLASTS $919 $180 Not Implemented
SU0501 # 05 Y:2020 05 2020 REDUCE VENTILATION AIR $273 $882 Not Implemented
SU0501 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $556 $999 Not Implemented
SU0501 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $2,583 $2,772 Not Implemented
SU0501 # 01 Y:2020 01 2020 ELIMINATE/REDUCE AN OPERATION $557 $20 Not Implemented
SU0500 # 03 Y:2020 03 2020 ELIMINATE/REDUCE AN OPERATION $11,303 $3,012 Not Implemented
SU0500 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $682 $785 Not Implemented
SU0500 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,803 $0 Not Implemented
SU0500 # 04 Y:2020 04 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $327 $294 Not Implemented
LE0497 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,793 $4,200 Not Implemented
SU0500 # 01 Y:2020 01 2020 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $285 $0 Not Implemented
SU0500 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,087 $14,773 Implemented
SU0500 # 07 Y:2020 07 2020 INSTALL OCCUPANCY SENSORS $257 $508 Not Implemented
LE0497 # 06 Y:2020 06 2020 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,520 $13,000 Not Implemented
LE0497 # 05 Y:2020 05 2020 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,765 $4,600 Not Implemented
LE0497 # 04 Y:2020 04 2020 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $2,905 $5,000 Not Implemented
LE0497 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $21,231 $32,000 Not Implemented
LE0497 # 02 Y:2020 02 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $13,727 $10,000 Not Implemented
SU0499 # 03 Y:2020 03 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,448 $4,525 Implemented
SU0499 # 04 Y:2020 04 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $627 $999 Not Implemented
SU0499 # 02 Y:2020 02 2020 REDUCE VENTILATION AIR $2,636 $882 Implemented
SU0499 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,223 $75,235 Implemented
SU0499 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,584 $534 Implemented
SU0499 # 05 Y:2020 05 2020 ELIMINATE/REDUCE AN OPERATION $6,889 $11,879 Implemented
SU0499 # 07 Y:2020 07 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $345 $64 Implemented