IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

249

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0238 # 11 Y:2006 11 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $378 $684 Not Implemented
SU0238 # 12 Y:2006 12 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,004 $67,500 Not Implemented
SU0238 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,431 $0 Not Implemented
SU0236 # 12 Y:2006 12 2006 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $288 $701 Not Implemented
SU0236 # 11 Y:2006 11 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,046 $8,856 Not Implemented
SU0236 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,858 $12,200 Implemented
SU0236 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $656 $1,314 Not Implemented
SU0236 # 08 Y:2006 08 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,279 $2,517 Implemented
SU0236 # 07 Y:2006 07 2006 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $65,227 $70,000 Implemented
SU0236 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $758 $220 Implemented
SU0236 # 05 Y:2006 05 2006 REPAIR OR REPLACE STEAM TRAPS $1,176 $365 Implemented
SU0236 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $4,245 $713 Implemented
SU0236 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $868 $127 Implemented
SU0236 # 02 Y:2006 02 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,416 $171 Not Implemented
SU0236 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,860 $0 Not Implemented
SU0235 # 08 Y:2006 08 2006 INSULATE FEEDWATER TANK $3,650 $720 Implemented
SU0235 # 01 Y:2006 01 2006 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,295 $0 Implemented
SU0235 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,954 $0 Implemented
SU0235 # 03 Y:2006 03 2006 CHECK FOR ACCURACY OF UTILITY / POWER METERS $255 $0 Implemented
SU0235 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $247 $0 Implemented
SU0235 # 05 Y:2006 05 2006 REPAIR OR REPLACE STEAM TRAPS $14,219 $1,527 Implemented
SU0235 # 06 Y:2006 06 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,179 $25 Implemented
SU0235 # 07 Y:2006 07 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $42,734 $6,467 Implemented
SU0235 # 14 Y:2006 14 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,613 $9,400 Not Implemented
SU0235 # 13 Y:2006 13 2006 KEEP BOILER TUBES CLEAN $1,255 $720 Implemented