IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
NAICS 3259 Other Chemical Product and Preparation Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0448 # 04 Y:2012 04 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $3,243 $14,500 Not Implemented
WV0448 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,979 $1,826 Implemented
WV0448 # 06 Y:2012 06 2012 USE RADIANT HEATER FOR SPOT HEATING $1,968 $10,438 Not Implemented
WV0448 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,424 $5,689 Not Implemented
WV0448 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,103 $1,000 Implemented
WV0448 # 09 Y:2012 09 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $117 $7 Implemented
WV0417 # 01 Y:2010 01 2010 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $34,786 $29,500 Not Implemented
WV0417 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,811 $46,085 Implemented
WV0417 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $10,416 $8,214 Implemented
WV0417 # 04 Y:2010 04 2010 DEVELOP A REPAIR/REPLACE POLICY $6,314 $1,220 Implemented
WV0417 # 05 Y:2010 05 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,608 $3,000 Implemented
WV0417 # 06 Y:2010 06 2010 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,780 $4,485 Not Implemented
WV0417 # 07 Y:2010 07 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,311 $7,750 Not Implemented
WV0417 # 08 Y:2010 08 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,656 $1,188 Implemented
WV0417 # 09 Y:2010 09 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,334 $1,500 Implemented
WV0417 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $976 $1,290 Not Implemented
UD0795 # 01 Y:2009 01 2009 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $40,310 $0 Implemented
UD0795 # 02 Y:2009 02 2009 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $27,536 $0 Not Implemented
UD0795 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,955 $43,300 Not Implemented
UD0795 # 04 Y:2009 04 2009 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,717 $11,000 Not Implemented
UD0795 # 05 Y:2009 05 2009 UPGRADE CONTROLS ON COMPRESSORS $2,905 $500 Implemented
UD0795 # 06 Y:2009 06 2009 INSULATE BARE EQUIPMENT $2,125 $300 Not Implemented
UD0795 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,002 $10,000 Not Implemented
UD0795 # 08 Y:2009 08 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,781 $0 Implemented
UD0795 # 09 Y:2009 09 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,807 $2,958 Not Implemented