IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

477

matching recommendations
Reset
NAICS 32619 Other Plastics Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0955 # 05 Y:2016 05 2016 COMBINE UTILITY METERS $2,301 $0 Not Implemented
UD0955 # 04 Y:2016 04 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $3,343 $1,152 Not Implemented
UD0955 # 03 Y:2016 03 2016 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $15,101 $15,500 Not Implemented
UD0955 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $15,783 $5,438 Not Implemented
UD0955 # 01 Y:2016 01 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $191 $0 Not Implemented
UD0953 # 09 Y:2016 09 2016 IMPROVE HANDLING PRACTICES $35,646 $100,000 Not Implemented
UD0953 # 08 Y:2016 08 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $964 $5,300 Not Implemented
UD0953 # 07 Y:2016 07 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $634 $0 Implemented
UD0953 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $3,158 $9,400 Not Implemented
UD0953 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,677 $32,500 Not Implemented
UD0953 # 04 Y:2016 04 2016 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,540 $25,000 Not Implemented
UD0953 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $577 $1,500 Not Implemented
UD0953 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,619 $0 Not Implemented
UD0953 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $5,190 $348 Not Implemented
UD0924 # 13 Y:2015 13 2015 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $357,410 $0 Not Implemented
UD0924 # 12 Y:2015 12 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,382 $0 Implemented
UD0924 # 11 Y:2015 11 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,383 $0 Not Implemented
UD0924 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $67,200 Implemented
UD0924 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $16,525 $6,100 Implemented
UD0924 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,134 $0 Not Implemented
UD0924 # 07 Y:2015 07 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $16,794 $0 Not Implemented
UD0924 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $22,071 $7,500 Implemented
UD0924 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,293 $470 Implemented
UD0924 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,861 $0 Not Implemented
UD0924 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,906 $1,200 Implemented