IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

929

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0556 # 07 Y:2018 07 2018 OPTIMIZE PLANT POWER FACTOR $7,284 $14,250 Implemented
WV0556 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,044 $0 Implemented
WV0556 # 09 Y:2018 09 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $4,873 Not Implemented
WV0556 # 10 Y:2018 10 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $864 $124 Implemented
WV0556 # 11 Y:2018 11 2018 DEVELOP A REPAIR/REPLACE POLICY $853 $758 Implemented
WV0556 # 12 Y:2018 12 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $763 $440 Implemented
WV0556 # 13 Y:2018 13 2018 INSULATE BARE EQUIPMENT $717 $604 Implemented
WV0556 # 14 Y:2018 14 2018 MINIMIZE WATER USAGE $350 $1,750 Not Implemented
UD0978 # 01 Y:2017 01 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,058 $0 Not Implemented
UD0978 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,107 $1,000 Not Implemented
UD0978 # 03 Y:2017 03 2017 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,562 $1,000 Not Implemented
UD0978 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $79,415 $79,850 Not Implemented
UD0978 # 05 Y:2017 05 2017 ADD AREA LIGHTING SWITCHES $2,220 $180 Not Implemented
UD0978 # 06 Y:2017 06 2017 USE OPTIMUM THICKNESS INSULATION $86,982 $91,480 Not Implemented
UD0978 # 07 Y:2017 07 2017 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $37,937 $100,000 Not Implemented
UD0978 # 08 Y:2017 08 2017 COVER OPEN TANKS $7,466 $5,000 Not Implemented
UD0978 # 09 Y:2017 09 2017 ADJUST BURNERS FOR EFFICIENT OPERATION $562 $0 Not Implemented
UM0480 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $35,941 $20,000 n/a
UM0480 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,908 $2,500 n/a
UM0480 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,601 $28,500 n/a
UM0480 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,087 $6,000 n/a
WV0534 # 01 Y:2016 01 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,092 $3,000 Not Implemented
WV0534 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,016 $0 Implemented
WV0534 # 03 Y:2016 03 2016 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,083 $1,000 Implemented
WV0534 # 04 Y:2016 04 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,026 $4,100 Implemented