IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

253

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0694 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $393 $13 Implemented
UD0694 # 15 Y:2004 15 2004 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $288 $0 Implemented
UD0693 # 01 Y:2004 01 2004 COVER OPEN TANKS $110,615 $44,621 Not Implemented
UD0693 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,110 $16,200 Not Implemented
UD0693 # 03 Y:2004 03 2004 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $13,945 $15,000 Not Implemented
UD0693 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,883 $9,060 Implemented
UD0693 # 05 Y:2004 05 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,534 $0 Not Implemented
UD0693 # 06 Y:2004 06 2004 RECOVER WASTE HEAT FROM EQUIPMENT $3,251 $200 Not Implemented
UD0693 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,006 $1,337 Implemented
UD0693 # 08 Y:2004 08 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,575 $0 Not Implemented
UD0693 # 09 Y:2004 09 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,466 $0 Implemented
UD0693 # 10 Y:2004 10 2004 REPAIR OR REPLACE STEAM TRAPS $1,299 $296 Implemented
UD0693 # 11 Y:2004 11 2004 INSTALL OCCUPANCY SENSORS $1,013 $420 Not Implemented
UD0693 # 12 Y:2004 12 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $899 $0 Not Implemented
UD0693 # 13 Y:2004 13 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $506 $0 Implemented
UD0693 # 14 Y:2004 14 2004 DISCONNECT BALLASTS $444 $13 Not Implemented
UD0693 # 15 Y:2004 15 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $210 $0 Not Implemented
UD0686 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,224 $7,681 Not Implemented
UD0686 # 02 Y:2004 02 2004 COVER OPEN TANKS $6,907 $1,110 Not Implemented
UD0686 # 03 Y:2004 03 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,095 $0 Not Implemented
UD0686 # 04 Y:2004 04 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,750 $0 Not Implemented
UD0686 # 05 Y:2004 05 2004 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $2,043 $2,478 Not Implemented
UD0686 # 06 Y:2004 06 2004 DISCONNECT BALLASTS $885 $667 Not Implemented
UD0686 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $240 Implemented
UD0686 # 08 Y:2004 08 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $392 $450 Implemented