IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0308 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $392 $1,000 Implemented
UM0308 # 05 Y:2006 05 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $536 $300 Implemented
UM0308 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,462 $3,479 Not Implemented
UM0308 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,070 $1,250 Not Implemented
UM0308 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $2,507 $500 Implemented
UM0308 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $3,769 $500 Implemented
UM0308 # 07 Y:2006 07 2006 INSULATE BARE EQUIPMENT $142 $310 Not Implemented
UD0744 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $60,139 $400,400 Not Implemented
UD0744 # 01 Y:2006 01 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $67,027 $1,500 Not Implemented
UD0744 # 03 Y:2006 03 2006 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $29,099 $50,000 Not Implemented
UD0744 # 04 Y:2006 04 2006 USE OPTIMUM THICKNESS INSULATION $24,529 $14,670 Not Implemented
UD0744 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,118 $33,800 Not Implemented
UD0744 # 06 Y:2006 06 2006 USE OPTIMUM THICKNESS INSULATION $17,062 $7,053 Not Implemented
UD0744 # 07 Y:2006 07 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $15,843 $3,000 Not Implemented
UD0744 # 08 Y:2006 08 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,657 $1,195 Not Implemented
UD0744 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $731 $0 Not Implemented
UM0301 # 09 Y:2006 09 2006 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $328 $328 Not Implemented
UM0301 # 10 Y:2006 10 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,062 $300 Not Implemented
UM0301 # 08 Y:2006 08 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,415 $1,363 Not Implemented
UM0301 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,325 $0 Implemented
UM0301 # 06 Y:2006 06 2006 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,498 $738 Not Implemented
UM0301 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,457 $375 Implemented
UM0301 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,344 $500 Not Implemented
UM0301 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $6,429 $9,875 Not Implemented
UM0301 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $6,754 $1,971 Implemented