IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
Reset
NAICS 332812 Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0458 # 02 Y:2012 02 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $32,380 $1,700 Implemented
WV0458 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,693 $2,220 Not Implemented
WV0458 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $640 $45 Not Implemented
WV0458 # 06 Y:2012 06 2012 COMBINE UTILITY METERS $1,490 $6,000 Not Implemented
WV0458 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $1,138 $573 Implemented
WV0458 # 05 Y:2012 05 2012 DEVELOP A REPAIR/REPLACE POLICY $2,928 $770 Implemented
UD0857 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $1,000 Not Implemented
UD0857 # 01 Y:2012 01 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $4,781 $2,000 Not Implemented
UD0857 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,979 $11,880 Not Implemented
UD0857 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,696 $6,800 Not Implemented
UD0857 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,324 $15,150 Not Implemented
UD0857 # 10 Y:2012 10 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $19,437 $211,596 Not Implemented
UD0857 # 09 Y:2012 09 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,816 $2,680 Not Implemented
UD0857 # 08 Y:2012 08 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,178 $36,000 Not Implemented
UD0857 # 07 Y:2012 07 2012 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,051 $2,000 Not Implemented
UD0857 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $834 $2,000 Not Implemented
UD0826 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $3,846 $23,040 Not Implemented
UD0826 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $5,734 $1,600 Implemented
UD0826 # 08 Y:2010 08 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $10,244 $2,000 Not Implemented
UD0826 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $51,028 $24,300 Not Implemented
UD0826 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $337 $1,750 Not Implemented
UD0826 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $788 $2,200 Implemented
UD0826 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $35,000 Implemented
UD0826 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $978 $60 Implemented
UD0826 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,036 $2,500 Implemented