Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsNAICS | 332813 | Electroplating, Plating, Polishing, Anodizing, and Coloring |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0913 # 06 Y:2014 | 06 | 2014 | REPLACE BOILER | $19,697 | $163,500 | Not Implemented |
UD0913 # 07 Y:2014 | 07 | 2014 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,485 | $5,000 | Not Implemented |
UD0913 # 08 Y:2014 | 08 | 2014 | COVER OPEN TANKS | $3,270 | $6,780 | Implemented |
UD0913 # 09 Y:2014 | 09 | 2014 | INSTALL AUTOMATIC STACK DAMPER | $2,665 | $0 | Implemented |
UD0913 # 10 Y:2014 | 10 | 2014 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $414,555 | $27,000 | Not Implemented |
UD0913 # 11 Y:2014 | 11 | 2014 | USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS | $27,921 | $55,000 | Not Implemented |
UD0913 # 12 Y:2014 | 12 | 2014 | TREAT AND REUSE RINSE WATERS | $15,837 | $10,000 | Not Implemented |
WV0457 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,482 | $500 | Implemented |
WV0457 # 06 Y:2012 | 06 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $2,244 | $775 | Not Implemented |
WV0457 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $2,539 | $5,407 | Implemented |
WV0457 # 04 Y:2012 | 04 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,000 | $12,251 | Not Implemented |
WV0457 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,986 | $22,500 | Implemented |
WV0457 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,854 | $6,400 | Not Implemented |
WV0457 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $330 | $50 | Implemented |
WV0457 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,415 | $2,620 | Not Implemented |
WV0457 # 07 Y:2012 | 07 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,189 | $1,000 | Implemented |
WV0457 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,194 | $150 | Not Implemented |
WV0457 # 10 Y:2012 | 10 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,022 | $950 | Not Implemented |
WV0457 # 12 Y:2012 | 12 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112 | $305 | Not Implemented |
UM0308 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,070 | $1,250 | Not Implemented |
UM0308 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,769 | $500 | Implemented |
UM0308 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,462 | $3,479 | Not Implemented |
UM0308 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $2,507 | $500 | Implemented |
UM0308 # 05 Y:2006 | 05 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $536 | $300 | Implemented |
UM0308 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $392 | $1,000 | Implemented |