IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

115

matching recommendations
Reset
NAICS 332813 Electroplating, Plating, Polishing, Anodizing, and Coloring
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0913 # 06 Y:2014 06 2014 REPLACE BOILER $19,697 $163,500 Not Implemented
UD0913 # 07 Y:2014 07 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,485 $5,000 Not Implemented
UD0913 # 08 Y:2014 08 2014 COVER OPEN TANKS $3,270 $6,780 Implemented
UD0913 # 09 Y:2014 09 2014 INSTALL AUTOMATIC STACK DAMPER $2,665 $0 Implemented
UD0913 # 10 Y:2014 10 2014 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $414,555 $27,000 Not Implemented
UD0913 # 11 Y:2014 11 2014 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $27,921 $55,000 Not Implemented
UD0913 # 12 Y:2014 12 2014 TREAT AND REUSE RINSE WATERS $15,837 $10,000 Not Implemented
WV0457 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,482 $500 Implemented
WV0457 # 06 Y:2012 06 2012 DEVELOP A REPAIR/REPLACE POLICY $2,244 $775 Not Implemented
WV0457 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,539 $5,407 Implemented
WV0457 # 04 Y:2012 04 2012 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $4,000 $12,251 Not Implemented
WV0457 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,986 $22,500 Implemented
WV0457 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,854 $6,400 Not Implemented
WV0457 # 11 Y:2012 11 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $330 $50 Implemented
WV0457 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $2,620 Not Implemented
WV0457 # 07 Y:2012 07 2012 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,189 $1,000 Implemented
WV0457 # 09 Y:2012 09 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,194 $150 Not Implemented
WV0457 # 10 Y:2012 10 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,022 $950 Not Implemented
WV0457 # 12 Y:2012 12 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $112 $305 Not Implemented
UM0308 # 03 Y:2006 03 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,070 $1,250 Not Implemented
UM0308 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $3,769 $500 Implemented
UM0308 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,462 $3,479 Not Implemented
UM0308 # 02 Y:2006 02 2006 REDUCE VENTILATION AIR $2,507 $500 Implemented
UM0308 # 05 Y:2006 05 2006 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $536 $300 Implemented
UM0308 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $392 $1,000 Implemented