IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0390 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $20,264 $4,490 Implemented
WV0390 # 06 Y:2009 06 2009 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $15,354 $2,490 Implemented
WV0390 # 07 Y:2009 07 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,020 $2,500 Implemented
WV0390 # 08 Y:2009 08 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,650 $0 Implemented
WV0390 # 09 Y:2009 09 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,395 $0 Implemented
WV0390 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,744 Implemented
WV0390 # 13 Y:2009 13 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $326 Implemented
UD0714 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $1,311 $1,200 Implemented
UD0714 # 03 Y:2005 03 2005 $12,150 $1,000 Implemented
UD0714 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $6,825 $3,000 Implemented
UD0714 # 07 Y:2005 07 2005 $2,772 $165 Implemented
UD0714 # 15 Y:2005 15 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $884 $0 Implemented
UD0714 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $1,138 $350 Implemented
UD0714 # 10 Y:2005 10 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,296 $0 Implemented
UD0714 # 08 Y:2005 08 2005 USE MINIMUM SAFE OVEN VENTILATION $1,972 $150 Implemented
WV0286 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,971 $250 Implemented
WV0286 # 05 Y:2004 05 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,455 $1,770 Implemented
WV0286 # 10 Y:2004 10 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $828 $283 Implemented
WV0286 # 03 Y:2004 03 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,072 $360 Implemented
WV0286 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $4,469 $3,580 Implemented
WV0286 # 06 Y:2004 06 2004 INSULATE BARE EQUIPMENT $1,353 $251 Implemented
WV0286 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $830 $0 Implemented
WV0286 # 12 Y:2004 12 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $318 $250 Implemented
WV0286 # 11 Y:2004 11 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $1,100 Implemented