IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0390 # 08 Y:2009 08 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,650 $0 Implemented
WV0390 # 09 Y:2009 09 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,395 $0 Implemented
WV0390 # 10 Y:2009 10 2009 RECOVER WASTE HEAT FROM EQUIPMENT $5,698 $3,136 Not Implemented
WV0390 # 11 Y:2009 11 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,744 Implemented
WV0390 # 12 Y:2009 12 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,219 $582 Not Implemented
WV0390 # 13 Y:2009 13 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $246 $326 Implemented
UD0714 # 01 Y:2005 01 2005 $14,094 $5,000 Not Implemented
UD0714 # 02 Y:2005 02 2005 $13,500 $10,000 Not Implemented
UD0714 # 03 Y:2005 03 2005 $12,150 $1,000 Implemented
UD0714 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $6,825 $3,000 Implemented
UD0714 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,482 $2,000 Not Implemented
UD0714 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,427 $14,204 Not Implemented
UD0714 # 07 Y:2005 07 2005 $2,772 $165 Implemented
UD0714 # 08 Y:2005 08 2005 USE MINIMUM SAFE OVEN VENTILATION $1,972 $150 Implemented
UD0714 # 09 Y:2005 09 2005 MINIMIZE WATER USAGE $1,311 $1,200 Implemented
UD0714 # 10 Y:2005 10 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,296 $0 Implemented
UD0714 # 11 Y:2005 11 2005 MINIMIZE WATER USAGE $1,138 $350 Implemented
UD0714 # 12 Y:2005 12 2005 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,000 $4,000 Not Implemented
UD0714 # 13 Y:2005 13 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $928 $200 Not Implemented
UD0714 # 14 Y:2005 14 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $884 $330 Not Implemented
UD0714 # 15 Y:2005 15 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $884 $0 Implemented
UD0714 # 16 Y:2005 16 2005 INSULATE BARE EQUIPMENT $361 $650 Not Implemented
WV0286 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,216 $7,012 Not Implemented
WV0286 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $4,469 $3,580 Implemented
WV0286 # 03 Y:2004 03 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,072 $360 Implemented