Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 333 | Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0676 # 01 Y:2003 | 01 | 2003 | OPTIMIZE PLANT POWER FACTOR | $19,216 | $6,000 | Implemented |
UD0676 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $14,997 | $5,000 | Not Implemented |
UD0676 # 05 Y:2003 | 05 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,147 | $2,000 | Implemented |
UD0676 # 07 Y:2003 | 07 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,739 | $500 | Not Implemented |
UD0676 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,230 | $200 | Implemented |
UD0676 # 06 Y:2003 | 06 | 2003 | DISCONNECT BALLASTS | $2,363 | $225 | Not Implemented |
UD0676 # 03 Y:2003 | 03 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,900 | $0 | Not Implemented |
UD0676 # 04 Y:2003 | 04 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,015 | $25,000 | Implemented |
UD0675 # 14 Y:2003 | 14 | 2003 | ADD AREA LIGHTING SWITCHES | $240 | $200 | Not Implemented |
UD0675 # 15 Y:2003 | 15 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $205 | $432 | Implemented |
UD0675 # 01 Y:2003 | 01 | 2003 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $26,842 | $625 | Implemented |
UD0675 # 13 Y:2003 | 13 | 2003 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $250 | $424 | Not Implemented |
UD0675 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $430 | $100 | Implemented |
UD0675 # 11 Y:2003 | 11 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $525 | $1,750 | Not Implemented |
UD0675 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $695 | $0 | Implemented |
UD0675 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,480 | $9,600 | Not Implemented |
UD0675 # 08 Y:2003 | 08 | 2003 | REDUCE FLUID FLOW RATES | $2,011 | $1,200 | Not Implemented |
UD0675 # 07 Y:2003 | 07 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,355 | $280 | Implemented |
UD0675 # 06 Y:2003 | 06 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $3,068 | $384 | Implemented |
UD0675 # 05 Y:2003 | 05 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,130 | $0 | Implemented |
UD0675 # 04 Y:2003 | 04 | 2003 | COMBINE UTILITY METERS | $4,000 | $0 | Not Implemented |
UD0675 # 03 Y:2003 | 03 | 2003 | OPTIMIZE PLANT POWER FACTOR | $7,934 | $2,500 | Not Implemented |
UD0675 # 02 Y:2003 | 02 | 2003 | $10,610 | $1,200 | Implemented | |
UD0674 # 08 Y:2003 | 08 | 2003 | ADD AREA LIGHTING SWITCHES | $687 | $500 | Not Implemented |
UD0674 # 09 Y:2003 | 09 | 2003 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $623 | $604 | Not Implemented |