IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0785 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,828 $98,908 Implemented
UD0785 # 10 Y:2008 10 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 Implemented
UD0763 # 02 Y:2007 02 2007 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $30,994 $8,900 Implemented
UD0763 # 01 Y:2007 01 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $36,135 $5,242 Implemented
WV0272 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $4,369 $621 Implemented
WV0272 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,533 $9,240 Implemented
WV0272 # 07 Y:2003 07 2003 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,209 $1,789 Implemented
WV0272 # 08 Y:2003 08 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,519 $675 Implemented
WV0272 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,390 $200 Implemented
WV0272 # 12 Y:2003 12 2003 USE SYNTHETIC LUBRICANT $1,058 $240 Implemented
WV0272 # 13 Y:2003 13 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,205 $80 Implemented
WV0272 # 04 Y:2003 04 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,265 $980 Implemented
WV0272 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $12,184 $721 Implemented
UD0411 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,652 $5,600 Implemented
UD0411 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,910 $8,910 Implemented
UD0389 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,419 $0 Implemented
UD0389 # 02 Y:1992 02 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $643 $50 Implemented
UD0389 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,929 $6,000 Implemented
UD0371 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,032 $300 Implemented
UD0371 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $473 $0 Implemented
UD0371 # 04 Y:1992 04 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,388 $45,000 Implemented
UD0239 # 04 Y:1987 04 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,069 $6,000 Implemented
UD0239 # 03 Y:1987 03 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,341 $600 Implemented
UD0239 # 02 Y:1987 02 1987 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $23,356 $10,000 Implemented
UD0239 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,627 $2,500 Implemented