IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0466 # 02 Y:2013 02 2013 INSULATE BARE EQUIPMENT $15,207 $35,976 Implemented
WV0466 # 11 Y:2013 11 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,129 $5,550 Not Implemented
WV0466 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $477 $470 Implemented
WV0466 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $113 Implemented
WV0430 # 03 Y:2011 03 2011 USE RADIANT HEATER FOR SPOT HEATING $39,290 $65,840 Not Implemented
WV0430 # 01 Y:2011 01 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $70,581 $20,000 Not Implemented
WV0430 # 06 Y:2011 06 2011 OPTIMIZE PLANT POWER FACTOR $25,696 $37,805 Not Implemented
WV0430 # 05 Y:2011 05 2011 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $28,475 $76,200 Not Implemented
WV0430 # 08 Y:2011 08 2011 COMBINE UTILITY METERS $10,426 $20,000 Not Implemented
WV0430 # 09 Y:2011 09 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $8,265 $57,400 Not Implemented
WV0430 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,692 $37,460 Implemented
WV0430 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $34,733 $26,650 Implemented
WV0430 # 02 Y:2011 02 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $43,659 $3,500 Implemented
UD0810 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,568 $0 Implemented
UD0810 # 01 Y:2010 01 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $27,208 $1,500 Implemented
UD0810 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,919 $1,000 Implemented
UD0810 # 03 Y:2010 03 2010 OPTIMIZE PLANT POWER FACTOR $5,338 $32,000 Not Implemented
UD0810 # 05 Y:2010 05 2010 METER WASTE WATER $4,167 $1,500 Not Implemented
UD0810 # 04 Y:2010 04 2010 USE RADIANT HEATER FOR SPOT HEATING $5,042 $2,000 Not Implemented
UD0810 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,614 $1,000 Implemented
UD0810 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,405 $2,242 Implemented
UD0810 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $532 $740 Not Implemented
UD0810 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $944 $1,834 Implemented
UD0810 # 12 Y:2010 12 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $200 $500 Not Implemented
UD0810 # 11 Y:2010 11 2010 INSTALL OCCUPANCY SENSORS $347 $34 Not Implemented