IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 267 Misc. Converted Paper Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0247 # 05 Y:2002 05 2002 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,412 $2,100 Implemented
WV0247 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $5,402 $305 Implemented
WV0247 # 07 Y:2002 07 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $8,312 $400 Implemented
WV0247 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,554 $970 Implemented
WV0247 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $346 $2,010 Implemented
WV0247 # 10 Y:2002 10 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,136 $2,744 Not Implemented
WV0247 # 11 Y:2002 11 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $396 $956 Not Implemented
WV0247 # 12 Y:2002 12 2002 RECOVER AND REUSE COOLING WATER $14,103 $7,000 Not Implemented
WV0247 # 13 Y:2002 13 2002 $14,000 $6,000 Not Implemented
UD0626 # 01 Y:2001 01 2001 $49,350 $4,680 Not Implemented
UD0626 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0626 # 03 Y:2001 03 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,326 $1,000 Implemented
UD0626 # 04 Y:2001 04 2001 ADJUST VENTS TO MINIMIZE ENERGY USE $2,451 $112 Implemented
UD0626 # 05 Y:2001 05 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,173 $364 Implemented
UD0626 # 06 Y:2001 06 2001 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,158 $1,050 Implemented
UD0626 # 07 Y:2001 07 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,847 $42 Implemented
UD0626 # 08 Y:2001 08 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,587 $423 Implemented
UD0626 # 09 Y:2001 09 2001 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $860 $250 Implemented
UD0626 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $2,526 Implemented
UD0626 # 11 Y:2001 11 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $514 $0 Not Implemented
UD0594 # 01 Y:2000 01 2000 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $189,338 $180,000 Not Implemented
UD0594 # 02 Y:2000 02 2000 $145,552 $100,000 Not Implemented
UD0594 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $342 $0 Implemented
UD0518 # 01 Y:1997 01 1997 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,625 $250 n/a
UD0518 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,672 $6,965 n/a