IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

445

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0545 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $516 $568 Implemented
WV0545 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $7,127 $2,800 Implemented
WV0545 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,951 $490 Implemented
WV0545 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $268 $20 Implemented
WV0545 # 03 Y:2017 03 2017 INSTALL SET-BACK TIMERS $4,904 $1,700 Implemented
UD0953 # 07 Y:2016 07 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $634 $0 Implemented
UD0924 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $38,906 $1,200 Implemented
UD0924 # 09 Y:2015 09 2015 INSTALL OCCUPANCY SENSORS $16,525 $6,100 Implemented
UD0924 # 01 Y:2015 01 2015 INSTALL TIMERS AND/OR THERMOSTATS $56,347 $2,000 Implemented
UD0924 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $67,200 Implemented
UD0924 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,293 $470 Implemented
UD0924 # 12 Y:2015 12 2015 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,382 $0 Implemented
UD0924 # 06 Y:2015 06 2015 INSULATE BARE EQUIPMENT $22,071 $7,500 Implemented
WV0488 # 04 Y:2014 04 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,681 $1,893 Implemented
WV0488 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,665 $9,243 Implemented
WV0488 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $571 $120 Implemented
WV0488 # 10 Y:2014 10 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $444 $320 Implemented
WV0488 # 03 Y:2014 03 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,735 $214 Implemented
WV0488 # 07 Y:2014 07 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,003 $1,000 Implemented
WV0488 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $327 $221 Implemented
UD0895 # 07 Y:2014 07 2014 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $249 $510 Implemented
UD0895 # 03 Y:2014 03 2014 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $48,509 $7,500 Implemented
UD0895 # 09 Y:2014 09 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,388 $800 Implemented
UD0895 # 01 Y:2014 01 2014 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $72,083 $0 Implemented
UD0895 # 02 Y:2014 02 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,208 $0 Implemented