IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0844 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,557 $0 Implemented
UD0844 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $267 $0 Implemented
UD0844 # 11 Y:2011 11 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,123 $1,000 Implemented
UD0844 # 14 Y:2011 14 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,762 $0 Implemented
WV0435 # 13 Y:2011 13 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $190 $16 Implemented
WV0435 # 12 Y:2011 12 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $330 $66 Implemented
WV0435 # 11 Y:2011 11 2011 USE SYNTHETIC LUBRICANT $608 $516 Implemented
WV0435 # 09 Y:2011 09 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,230 $1,000 Implemented
WV0435 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,437 $4,415 Implemented
WV0435 # 06 Y:2011 06 2011 DEVELOP A REPAIR/REPLACE POLICY $1,546 $668 Implemented
WV0435 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,758 $272 Implemented
WV0435 # 02 Y:2011 02 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $7,088 $2,144 Implemented
UD0842 # 14 Y:2011 14 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $39,018 $150,000 Implemented
UD0842 # 13 Y:2011 13 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,187 $0 Implemented
UD0842 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,657 $500 Implemented
UD0842 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,725 $3,654 Implemented
UD0842 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,753 $2,522 Implemented
UD0842 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,006 $0 Implemented