IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

414

matching recommendations
Reset
SIC 33 Primary Metal Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0372 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $25,000 Implemented
UM0372 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $265 $2,000 Implemented
UM0372 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $645 $200 Implemented
UM0372 # 05 Y:2010 05 2010 RECOVER WASTE HEAT FROM EQUIPMENT $88 $1,000 Implemented
UM0372 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,702 $3,500 Implemented
UM0372 # 07 Y:2010 07 2010 COVER OPEN TANKS $17,216 $7,182 Implemented
UM0372 # 08 Y:2010 08 2010 COVER OPEN TANKS $10,159 $500 Implemented
UM0372 # 09 Y:2010 09 2010 COVER OPEN TANKS $9,602 $2,472 Implemented
UD0808 # 21 Y:2009 21 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,836 $0 Implemented
UD0808 # 16 Y:2009 16 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,446 $1,000 Implemented
UD0774 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $94,656 $6,000 Implemented
UD0774 # 03 Y:2008 03 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $83,440 $5,000 Implemented
UD0774 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,705 $3,275 Implemented
UD0774 # 06 Y:2008 06 2008 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $9,454 $0 Implemented
UD0774 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,371 $2,250 Implemented
UD0774 # 11 Y:2008 11 2008 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,078 $0 Implemented
UD0766 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $78,420 $279,770 Implemented
UD0766 # 07 Y:2007 07 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $40,000 $1,100 Implemented
UD0766 # 08 Y:2007 08 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,800 $20,000 Implemented
UD0766 # 10 Y:2007 10 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,343 $85,140 Implemented
UD0766 # 11 Y:2007 11 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,564 $19,275 Implemented
UD0766 # 14 Y:2007 14 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,115 $0 Implemented
UD0761 # 13 Y:2007 13 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $357 $0 Implemented
UD0761 # 12 Y:2007 12 2007 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $898 $1,600 Implemented
UD0761 # 11 Y:2007 11 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,025 $0 Implemented