IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0299 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $900 $0 Implemented
UD0299 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,667 $750 Implemented
UD0299 # 04 Y:1989 04 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $889 $750 Implemented
UD0299 # 05 Y:1989 05 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,588 $1,720 Implemented
UD0299 # 01 Y:1989 01 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,009 $0 Not Implemented
UD0292 # 03 Y:1989 03 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,528 $0 Not Implemented
UD0292 # 04 Y:1989 04 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,582 $15,000 Not Implemented
UD0292 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,465 $233 Implemented
UD0292 # 01 Y:1989 01 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $664 $2,400 Not Implemented
UD0289 # 03 Y:1989 03 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,150 $4,000 Not Implemented
UD0289 # 07 Y:1989 07 1989 RECOVER AND REUSE COOLING WATER $5,791 $20,000 Not Implemented
UD0289 # 06 Y:1989 06 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,331 $25,000 Not Implemented
UD0289 # 05 Y:1989 05 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $356 $75 Implemented
UD0289 # 04 Y:1989 04 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $791 $1,000 Not Implemented
UD0289 # 02 Y:1989 02 1989 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,453 $0 Implemented
UD0289 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $3,618 $1,000 Not Implemented
UD0286 # 06 Y:1989 06 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $117,912 $60,000 Implemented
UD0286 # 07 Y:1989 07 1989 INSTALL STORM WINDOWS AND DOORS $47,948 $47,000 Not Implemented
UD0286 # 08 Y:1989 08 1989 INSTALL TIMERS AND/OR THERMOSTATS $9,312 $0 Implemented
UD0286 # 05 Y:1989 05 1989 OPTIMIZE PLANT POWER FACTOR $6,809 $12,000 Implemented
UD0286 # 04 Y:1989 04 1989 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $1,105 $6,000 Not Implemented
UD0286 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,690 $0 Implemented
UD0286 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,354 $0 Implemented
UD0286 # 03 Y:1989 03 1989 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $543 $0 Implemented
UD0281 # 01 Y:1989 01 1989 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,368 $0 Implemented