IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

75

matching recommendations
Reset
SIC 34 Fabricated Metal Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0826 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $3,846 $23,040 Not Implemented
UD0826 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,622 $2,500 Implemented
UD0826 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,036 $2,500 Implemented
UD0826 # 03 Y:2010 03 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $978 $60 Implemented
UD0826 # 08 Y:2010 08 2010 IMPROVE COMBUSTION CONTROL CAPABILITY $10,244 $2,000 Not Implemented
UD0826 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $5,734 $1,600 Implemented
UD0826 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,213 $35,000 Implemented
UD0826 # 06 Y:2010 06 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $337 $1,750 Not Implemented
UD0826 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $51,028 $24,300 Not Implemented
UD0826 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $788 $2,200 Implemented
WV0415 # 03 Y:2010 03 2010 REDUCE VENTILATION AIR $18,153 $5,000 Not Implemented
WV0415 # 05 Y:2010 05 2010 USE RADIANT HEATER FOR SPOT HEATING $12,353 $34,050 Not Implemented
WV0415 # 11 Y:2010 11 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,398 $4,490 Implemented
WV0415 # 04 Y:2010 04 2010 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,296 $7,820 Implemented
WV0415 # 08 Y:2010 08 2010 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,733 $700 Implemented
WV0415 # 02 Y:2010 02 2010 UPGRADE CONTROLS ON COMPRESSORS $21,876 $30,800 Not Implemented
WV0415 # 12 Y:2010 12 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,032 $1,312 Implemented
WV0415 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,767 $1,503 Implemented
WV0415 # 07 Y:2010 07 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,621 $2,000 Implemented
WV0415 # 09 Y:2010 09 2010 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $4,603 $5,265 Not Implemented
WV0415 # 10 Y:2010 10 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,852 $884 Implemented
WV0415 # 01 Y:2010 01 2010 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $86,422 $15,000 Not Implemented
UD0823 # 15 Y:2010 15 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $355 $25 Implemented
UD0823 # 01 Y:2010 01 2010 COMBINE UTILITY METERS $6,391 $200 Not Implemented
UD0823 # 03 Y:2010 03 2010 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $253 $25 Not Implemented