Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
85
matching recommendationsSIC | 34 | Fabricated Metal Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0534 # 09 Y:2016 | 09 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $474 | $256 | Implemented |
WV0534 # 08 Y:2016 | 08 | 2016 | INSTALL OCCUPANCY SENSORS | $616 | $315 | Implemented |
WV0534 # 03 Y:2016 | 03 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,083 | $1,000 | Implemented |
WV0534 # 04 Y:2016 | 04 | 2016 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,026 | $4,100 | Implemented |
WV0534 # 07 Y:2016 | 07 | 2016 | INSULATE BARE EQUIPMENT | $1,196 | $1,953 | Implemented |
WV0534 # 11 Y:2016 | 11 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $50 | Implemented |
WV0534 # 10 Y:2016 | 10 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $1,125 | Implemented |
WV0534 # 05 Y:2016 | 05 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,565 | $4,150 | Not Implemented |
WV0534 # 01 Y:2016 | 01 | 2016 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $28,092 | $3,000 | Not Implemented |
WV0534 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,300 | $2,900 | Not Implemented |
WV0534 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,016 | $0 | Implemented |
UD0954 # 02 Y:2016 | 02 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,397 | $1,000 | Not Implemented |
UD0954 # 03 Y:2016 | 03 | 2016 | UPGRADE CONTROLS ON COMPRESSORS | $1,140 | $378 | Not Implemented |
UD0954 # 07 Y:2016 | 07 | 2016 | INSTALL OCCUPANCY SENSORS | $3,097 | $6,944 | Not Implemented |
UD0954 # 04 Y:2016 | 04 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $297 | $468 | Not Implemented |
UD0954 # 08 Y:2016 | 08 | 2016 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $97 | $336 | Not Implemented |
UD0954 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,273 | $0 | Implemented |
UD0954 # 01 Y:2016 | 01 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,653 | $42 | Not Implemented |
UD0954 # 06 Y:2016 | 06 | 2016 | DEVELOP A REPAIR/REPLACE POLICY | $1,258 | $3,250 | Implemented |
UD0949 # 04 Y:2016 | 04 | 2016 | OPTIMIZE PLANT POWER FACTOR | $9,976 | $4,120 | Not Implemented |
UD0949 # 05 Y:2016 | 05 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $807 | $1,000 | Implemented |
UD0949 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $36,312 | $5,400 | Implemented |
UD0949 # 06 Y:2016 | 06 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $66 | $500 | Not Implemented |
UD0949 # 02 Y:2016 | 02 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,698 | $2,125 | Not Implemented |
UD0949 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,691 | $2,800 | Not Implemented |