IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
SIC 3462 Iron And Steel Forgings
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0941 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $943 $3,250 Not Implemented
UD0941 # 07 Y:2016 07 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,067 $0 Implemented
UD0941 # 05 Y:2016 05 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,109 $4,500 Not Implemented
UD0941 # 03 Y:2016 03 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,441 $0 Implemented
UD0941 # 02 Y:2016 02 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,653 $0 Implemented
UD0941 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,010 $4,150 Not Implemented
UD0941 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $3,537 $50 Implemented
WV0495 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $5,211 Implemented
WV0495 # 03 Y:2014 03 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,441 $15,000 Not Implemented
WV0495 # 06 Y:2014 06 2014 INSULATE BARE EQUIPMENT $5,177 $5,764 Implemented
WV0495 # 05 Y:2014 05 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,578 $7,154 Implemented
WV0495 # 04 Y:2014 04 2014 INSTALL SET-BACK TIMERS $10,203 $4,200 Implemented
WV0495 # 08 Y:2014 08 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,156 $725 Implemented
WV0495 # 02 Y:2014 02 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $51,326 $26,640 Not Implemented
WV0495 # 01 Y:2014 01 2014 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $193,883 $164,700 Not Implemented
UD0819 # 07 Y:2010 07 2010 USE OPTIMUM THICKNESS INSULATION $33,608 $35,440 Not Implemented
UD0819 # 08 Y:2010 08 2010 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $22,346 $44,693 Not Implemented
UD0819 # 09 Y:2010 09 2010 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $11,925 $7,032 Not Implemented
UD0819 # 06 Y:2010 06 2010 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $5,479 $1,000 Not Implemented
UD0819 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,928 $500 Not Implemented
UD0819 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,721 $20 Not Implemented
UD0819 # 01 Y:2010 01 2010 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $145,245 $145,245 Not Implemented
UD0819 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,439 $30,037 Not Implemented
UD0819 # 10 Y:2010 10 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $6,484 $6,000 Not Implemented
UD0819 # 11 Y:2010 11 2010 USE OPTIMUM TEMPERATURE $3,080 $6,160 Not Implemented