IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 35 Industrial Machinery And Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0314 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,571 $25,000 Implemented
UD0314 # 09 Y:1990 09 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,980 $0 Not Implemented
UD0314 # 08 Y:1990 08 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $83,411 $150,000 Implemented
UD0314 # 07 Y:1990 07 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,223 $33,000 Implemented
UD0314 # 06 Y:1990 06 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $16,450 $500 Not Implemented
UD0314 # 05 Y:1990 05 1990 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,638 $0 Not Implemented
UD0314 # 04 Y:1990 04 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,341 $6,000 Not Implemented
UD0314 # 03 Y:1990 03 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,489 $8,000 Implemented
UD0314 # 02 Y:1990 02 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,218 $14,000 Implemented
UD0304 # 05 Y:1990 05 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,558 $1,500 Implemented
UD0303 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $761 $800 Implemented
UD0303 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $276 $400 Not Implemented
UD0303 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,496 $3,102 Implemented
UD0304 # 01 Y:1990 01 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,855 $2,800 Not Implemented
UD0304 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $867 $1,000 Not Implemented
UD0304 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,928 $4,920 Implemented
UD0304 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $0 Implemented
UD0303 # 01 Y:1990 01 1990 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,148 $0 Implemented
UD0304 # 06 Y:1990 06 1990 RECOVER WASTE HEAT FROM EQUIPMENT $3,648 $7,000 Not Implemented
UD0301 # 07 Y:1990 07 1990 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,574 $5,000 Implemented
UD0301 # 06 Y:1990 06 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,399 $0 Implemented
UD0301 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $1,252 $0 Implemented
UD0301 # 04 Y:1990 04 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,480 $0 Not Implemented
UD0301 # 03 Y:1990 03 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,636 $0 Not Implemented
UD0301 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,236 $0 Not Implemented