Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
207
matching recommendationsSIC | 36 | Electronic & Other Electric Equipment |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0225 # 05 Y:1987 | 05 | 1987 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,248 | $6,000 | Implemented |
UD0225 # 06 Y:1987 | 06 | 1987 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,131 | $14,688 | Implemented |
UD0221 # 02 Y:1987 | 02 | 1987 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $16,515 | $0 | Implemented |
UD0221 # 03 Y:1987 | 03 | 1987 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,218 | $0 | Implemented |
UD0221 # 04 Y:1987 | 04 | 1987 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $7,322 | $10,000 | Implemented |
UD0221 # 05 Y:1987 | 05 | 1987 | INSTALL TIMERS AND/OR THERMOSTATS | $7,926 | $9,000 | Implemented |
UD0221 # 06 Y:1987 | 06 | 1987 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $2,822 | $2,070 | Implemented |
UD0157 # 01 Y:1985 | 01 | 1985 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,237 | $250 | Implemented |
UD0157 # 03 Y:1985 | 03 | 1985 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,875 | $1,994 | Implemented |
UD0150 # 01 Y:1985 | 01 | 1985 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,440 | $0 | Implemented |
UD0150 # 04 Y:1985 | 04 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $646 | $140 | Implemented |
UD0150 # 05 Y:1985 | 05 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $702 | $3,000 | Implemented |
UD0150 # 06 Y:1985 | 06 | 1985 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,218 | $1,360 | Implemented |
UD0137 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $6,700 | $3,000 | Implemented |
UD0086 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,108 | $480 | Implemented |
UD0086 # 02 Y:1983 | 02 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,175 | $3,300 | Implemented |
UD0086 # 03 Y:1983 | 03 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $204 | $0 | Implemented |
UD0086 # 04 Y:1983 | 04 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $139 | $30 | Implemented |
UD0049 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,155 | $320 | Implemented |
UD0049 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $773 | $0 | Implemented |
UD0049 # 03 Y:1982 | 03 | 1982 | REDUCE GLAZED AREAS IN BUILDINGS | $28,537 | $40,346 | Implemented |
UD0049 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $14,665 | $163,485 | Implemented |
UD0049 # 05 Y:1982 | 05 | 1982 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $7,008 | $7,500 | Implemented |
UD0039 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,698 | $1,557 | Implemented |
UD0039 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $480 | $0 | Implemented |