IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0225 # 05 Y:1987 05 1987 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,248 $6,000 Implemented
UD0225 # 06 Y:1987 06 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,131 $14,688 Implemented
UD0221 # 02 Y:1987 02 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $16,515 $0 Implemented
UD0221 # 03 Y:1987 03 1987 RECOVER WASTE HEAT FROM EQUIPMENT $6,218 $0 Implemented
UD0221 # 04 Y:1987 04 1987 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $7,322 $10,000 Implemented
UD0221 # 05 Y:1987 05 1987 INSTALL TIMERS AND/OR THERMOSTATS $7,926 $9,000 Implemented
UD0221 # 06 Y:1987 06 1987 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,822 $2,070 Implemented
UD0157 # 01 Y:1985 01 1985 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,237 $250 Implemented
UD0157 # 03 Y:1985 03 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,875 $1,994 Implemented
UD0150 # 01 Y:1985 01 1985 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,440 $0 Implemented
UD0150 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $646 $140 Implemented
UD0150 # 05 Y:1985 05 1985 RECOVER WASTE HEAT FROM EQUIPMENT $702 $3,000 Implemented
UD0150 # 06 Y:1985 06 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,218 $1,360 Implemented
UD0137 # 01 Y:1984 01 1984 INSULATE BARE EQUIPMENT $6,700 $3,000 Implemented
UD0086 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $480 Implemented
UD0086 # 02 Y:1983 02 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,175 $3,300 Implemented
UD0086 # 03 Y:1983 03 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $204 $0 Implemented
UD0086 # 04 Y:1983 04 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $139 $30 Implemented
UD0049 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,155 $320 Implemented
UD0049 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $773 $0 Implemented
UD0049 # 03 Y:1982 03 1982 REDUCE GLAZED AREAS IN BUILDINGS $28,537 $40,346 Implemented
UD0049 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,665 $163,485 Implemented
UD0049 # 05 Y:1982 05 1982 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,008 $7,500 Implemented
UD0039 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,698 $1,557 Implemented
UD0039 # 02 Y:1982 02 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $480 $0 Implemented