IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0905 # 04 Y:2014 04 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,046 $0 Implemented
WV0476 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $251 $50 Implemented
WV0476 # 11 Y:2013 11 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $259 $140 Implemented
WV0476 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $301 $90 Implemented
WV0476 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $1,431 Implemented
WV0476 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $621 $233 Not Implemented
WV0476 # 07 Y:2013 07 2013 AIR CONDITION ONLY SPACE NECESSARY $643 $3,920 Not Implemented
WV0476 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $756 $3,667 Not Implemented
WV0476 # 05 Y:2013 05 2013 RECOVER WASTE HEAT FROM EQUIPMENT $845 $1,940 Implemented
WV0476 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,046 $26,555 Implemented
WV0476 # 02 Y:2013 02 2013 INSTALL TIMERS AND/OR THERMOSTATS $13,346 $4,200 Implemented
WV0476 # 04 Y:2013 04 2013 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,749 $5,400 Not Implemented
WV0476 # 03 Y:2013 03 2013 COMBINE UTILITY METERS $3,940 $1,800 Not Implemented
UD0883 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $2,161 $2,100 Implemented
UD0883 # 05 Y:2013 05 2013 USE SOLAR HEAT TO MAKE ELECTRICTY $14,883 $105,000 Not Implemented
UD0883 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $521 $0 Implemented
UD0883 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $104 $90 Implemented
UD0883 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,986 $0 Implemented
UD0864 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,307 $2,925 Implemented
UD0864 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,365 $2,650 Implemented
UD0864 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,365 $2,650 Implemented
UD0864 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $5,184 $0 Not Implemented
UD0864 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $888 $1,300 Implemented
UD0864 # 09 Y:2012 09 2012 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $27,112 $122,500 Not Implemented