IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

388

matching recommendations
Reset
SIC 36 Electronic & Other Electric Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0779 # 11 Y:2008 11 2008 $4,322 $0 Implemented
UD0779 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,499 $9,173 Not Implemented
UD0779 # 09 Y:2008 09 2008 OPTIMIZE PLANT POWER FACTOR $5,482 $3,000 Not Implemented
UD0779 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,679 $35,000 Not Implemented
UD0779 # 06 Y:2008 06 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $75,942 $100,000 Implemented
UD0779 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $13,503 $3,318 Implemented
UD0779 # 04 Y:2008 04 2008 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $13,555 $500 Implemented
UD0779 # 03 Y:2008 03 2008 REPLACE BOILER $17,736 $65,000 Implemented
UD0779 # 02 Y:2008 02 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,648 $1,000 Implemented
UD0779 # 08 Y:2008 08 2008 INSULATE BARE EQUIPMENT $8,895 $412 Implemented
UD0712 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,715 $60 Implemented
UD0712 # 02 Y:2005 02 2005 UPGRADE CONTROLS ON COMPRESSORS $8,635 $1,000 Implemented
UD0712 # 03 Y:2005 03 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,212 $22,500 Not Implemented
UD0712 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,955 $20,660 Not Implemented
UD0712 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,839 $839 Implemented
UD0712 # 06 Y:2005 06 2005 $2,256 $0 Not Implemented
UD0712 # 07 Y:2005 07 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,166 $525 Implemented
UD0712 # 08 Y:2005 08 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,616 $1,000 Not Implemented
UD0712 # 09 Y:2005 09 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,498 $0 Not Implemented
UD0712 # 10 Y:2005 10 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $953 $0 Not Implemented
UD0712 # 11 Y:2005 11 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $259 $1,000 Implemented
UD0695 # 12 Y:2004 12 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $729 $0 Implemented
UD0695 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $397 $756 Implemented
UD0695 # 14 Y:2004 14 2004 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $420 $340 Not Implemented
UD0695 # 15 Y:2004 15 2004 AIR CONDITION ONLY SPACE NECESSARY $339 $0 Implemented