IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

29

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0656 # 08 Y:2002 08 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $225 $80 Implemented
UD0656 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,266 $3,422 Implemented
UD0656 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $2,338 $110 Not Implemented
UD0656 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,677 $1,680 Not Implemented
UD0656 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,934 $1,390 Not Implemented
UD0656 # 03 Y:2002 03 2002 $24,000 $2,500 Not Implemented
UD0656 # 02 Y:2002 02 2002 $36,000 $0 Implemented
UD0656 # 01 Y:2002 01 2002 $160,000 $0 Not Implemented
UD0652 # 02 Y:2002 02 2002 $60,053 $40,000 Implemented
UD0652 # 11 Y:2002 11 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $196 $300 Not Implemented
UD0652 # 10 Y:2002 10 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,398 $504 Implemented
UD0652 # 09 Y:2002 09 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,123 $4,332 Implemented
UD0652 # 08 Y:2002 08 2002 INSTALL COMMON HEADER ON COMPRESSORS $2,408 $0 Implemented
UD0652 # 07 Y:2002 07 2002 $3,456 $6,000 Not Implemented
UD0652 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $10,260 Implemented
UD0652 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $4,374 $3,000 Not Implemented
UD0652 # 04 Y:2002 04 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $12,960 $504 Implemented
UD0652 # 03 Y:2002 03 2002 REPROCESS SPENT OILS ON SITE FOR RE-USE $42,000 $54,000 Not Implemented
UD0652 # 01 Y:2002 01 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $91,917 $40,580 Implemented
UD0645 # 01 Y:2002 01 2002 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $64,277 $3,300 n/a
UD0645 # 02 Y:2002 02 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $28,640 $1,000 n/a
UD0645 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,252 $0 n/a
UD0645 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $10,178 $2,325 n/a
UD0645 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,257 $363 n/a
UD0645 # 06 Y:2002 06 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,431 $7,030 n/a