Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
406
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0683 # 04 Y:2003 | 04 | 2003 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,225 | $0 | Not Implemented |
UD0683 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $200 | $0 | Not Implemented |
UD0683 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,720 | $11,700 | Implemented |
UD0683 # 05 Y:2003 | 05 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $925 | $0 | Not Implemented |
UD0683 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $2,600 | $4,625 | Not Implemented |
UD0683 # 01 Y:2003 | 01 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $30,335 | $50,000 | Not Implemented |
UD0682 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,674 | $15,870 | Not Implemented |
UD0682 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,809 | $47,488 | Not Implemented |
UD0682 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,062 | $5,376 | Not Implemented |
UD0682 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,255 | $5,000 | Not Implemented |
UD0682 # 09 Y:2003 | 09 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $2,596 | $0 | Implemented |
UD0682 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $366 | $428 | Not Implemented |
UD0682 # 07 Y:2003 | 07 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,800 | $2,000 | Implemented |
UD0682 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,790 | $3,000 | Implemented |
UD0682 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $11,000 | Not Implemented |
UD0682 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $1,534 | $116 | Not Implemented |
UD0682 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $1,000 | Implemented |
UD0680 # 03 Y:2003 | 03 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $9,824 | $2,160 | Not Implemented |
UD0680 # 09 Y:2003 | 09 | 2003 | OPTIMIZE PLANT POWER FACTOR | $4,028 | $5,000 | Not Implemented |
UD0680 # 11 Y:2003 | 11 | 2003 | COVER OPEN TANKS | $2,708 | $1,375 | Implemented |
UD0680 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,465 | $900 | Implemented |
UD0680 # 02 Y:2003 | 02 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,750 | $1,460 | Implemented |
UD0680 # 13 Y:2003 | 13 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,815 | $0 | Implemented |
UD0680 # 08 Y:2003 | 08 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,115 | $0 | Not Implemented |
UD0680 # 10 Y:2003 | 10 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,078 | $0 | Implemented |