Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,225
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0683 # 01 Y:2003 | 01 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $30,335 | $50,000 | Not Implemented |
UD0683 # 04 Y:2003 | 04 | 2003 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $1,225 | $0 | Not Implemented |
UD0683 # 05 Y:2003 | 05 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $925 | $0 | Not Implemented |
UD0683 # 06 Y:2003 | 06 | 2003 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $200 | $0 | Not Implemented |
UD0683 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,720 | $11,700 | Implemented |
UD0683 # 03 Y:2003 | 03 | 2003 | INSULATE BARE EQUIPMENT | $2,600 | $4,625 | Not Implemented |
UD0682 # 05 Y:2003 | 05 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,790 | $3,000 | Implemented |
UD0682 # 08 Y:2003 | 08 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,025 | $1,000 | Implemented |
UD0682 # 10 Y:2003 | 10 | 2003 | DISCONNECT BALLASTS | $1,534 | $116 | Not Implemented |
UD0682 # 09 Y:2003 | 09 | 2003 | DEVELOP STANDARD OPERATING PROCEDURES | $2,596 | $0 | Implemented |
UD0682 # 11 Y:2003 | 11 | 2003 | INSTALL OCCUPANCY SENSORS | $366 | $428 | Not Implemented |
UD0682 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,062 | $5,376 | Not Implemented |
UD0682 # 07 Y:2003 | 07 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,800 | $2,000 | Implemented |
UD0682 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,674 | $15,870 | Not Implemented |
UD0682 # 03 Y:2003 | 03 | 2003 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $21,300 | $11,000 | Not Implemented |
UD0682 # 04 Y:2003 | 04 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,809 | $47,488 | Not Implemented |
UD0682 # 02 Y:2003 | 02 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,255 | $5,000 | Not Implemented |
UD0680 # 14 Y:2003 | 14 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,717 | $0 | Not Implemented |
UD0680 # 02 Y:2003 | 02 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,750 | $1,460 | Implemented |
UD0680 # 13 Y:2003 | 13 | 2003 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,815 | $0 | Implemented |
UD0680 # 01 Y:2003 | 01 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $24,031 | $500 | Implemented |
UD0680 # 03 Y:2003 | 03 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $9,824 | $2,160 | Not Implemented |
UD0680 # 11 Y:2003 | 11 | 2003 | COVER OPEN TANKS | $2,708 | $1,375 | Implemented |
UD0680 # 12 Y:2003 | 12 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,465 | $900 | Implemented |
UD0680 # 10 Y:2003 | 10 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $3,078 | $0 | Implemented |