Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
369
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0315 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $34,667 | $8,066 | Not Implemented |
UM0315 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $32,300 | $80,207 | Not Implemented |
UM0315 # 07 Y:2006 | 07 | 2006 | ADD AREA LIGHTING SWITCHES | $1,294 | $1,100 | Not Implemented |
UM0315 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $1,369 | $230 | Not Implemented |
UM0315 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $53,281 | $1,800 | Not Implemented |
UM0315 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $27,713 | $40,991 | Not Implemented |
UM0315 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $36,263 | $15,000 | Not Implemented |
UM0315 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $526 | $225 | Implemented |
UD0752 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,592 | $0 | Implemented |
UD0752 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,798 | $225 | Implemented |
UD0752 # 02 Y:2006 | 02 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $7,542 | $0 | Implemented |
UD0752 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,473 | $40,463 | Implemented |
UD0752 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,557 | $0 | Implemented |
WV0349 # 06 Y:2006 | 06 | 2006 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,322 | $3,250 | Not Implemented |
WV0349 # 01 Y:2006 | 01 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $167,255 | $32,010 | Not Implemented |
WV0349 # 05 Y:2006 | 05 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,522 | $600 | Not Implemented |
WV0349 # 10 Y:2006 | 10 | 2006 | OPTIMIZE PLANT POWER FACTOR | $3,456 | $10,700 | Not Implemented |
WV0349 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,291 | $1,000 | Implemented |
WV0349 # 02 Y:2006 | 02 | 2006 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $48,286 | $39,350 | Implemented |
WV0349 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $1,998 | $512 | Implemented |
WV0349 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,242 | $400 | Implemented |
WV0349 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $375 | $200 | Implemented |
WV0349 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $13,672 | $10,295 | Implemented |
WV0349 # 09 Y:2006 | 09 | 2006 | INSULATE BARE EQUIPMENT | $3,740 | $1,318 | Implemented |
WV0349 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $14,527 | $640 | Implemented |