IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0120 # 08 Y:2021 08 2021 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $217 $86 Implemented
CW0120 # 07 Y:2021 07 2021 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000,000 $122,000 Implemented
CW0120 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $899 $0 Implemented
CW0120 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,965 $510 Implemented
CW0120 # 04 Y:2021 04 2021 MODIFY STARTUP/SHUTDOWN TIMES $2,380 $100,000 Implemented
CW0120 # 01 Y:2021 01 2021 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $30,000 $70,084 Implemented
CW0120 # 02 Y:2021 02 2021 INSTALL BACK-UP EQUIPMENT $32,054 $93,000 Implemented
CW0120 # 03 Y:2021 03 2021 USE BATTERY STORAGE FOR DEMAND CONTROL $18,089 $25,885 Implemented
CW0119 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,804 $0 Implemented
CW0119 # 02 Y:2021 02 2021 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,402 $1,640 Implemented
CW0119 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,554 $0 Not Implemented
CW0119 # 04 Y:2021 04 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,741 $613 Not Implemented
CW0119 # 05 Y:2021 05 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,381 $6,000 Implemented
CW0119 # 06 Y:2021 06 2021 IMPROVE LUBRICATION PRACTICES $21,048 $10,400 Not Implemented
CW0119 # 07 Y:2021 07 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,837 $1,000 Implemented
CW0118 # 02 Y:2021 02 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $33,972 $0 Not Implemented
CW0118 # 06 Y:2021 06 2021 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $731 $0 Not Implemented
CW0118 # 05 Y:2021 05 2021 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $7,306 $0 Not Implemented
CW0118 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $479 $750 Not Implemented
CW0118 # 03 Y:2021 03 2021 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $331 $458 Not Implemented
CW0118 # 01 Y:2021 01 2021 INSULATE BARE EQUIPMENT $65,757 $2,574 Not Implemented
WV0615 # 10 Y:2021 10 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $307 $1,000 Implemented
WV0615 # 01 Y:2021 01 2021 UPGRADE CONTROLS ON COMPRESSORS $8,661 $16,998 Not Implemented
WV0615 # 04 Y:2021 04 2021 INSULATE BARE EQUIPMENT $3,209 $13,902 Not Implemented
WV0615 # 03 Y:2021 03 2021 OPTIMIZE PLANT POWER FACTOR $4,561 $13,105 Not Implemented