IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0373 # 05 Y:1992 05 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,143 $15,000 Not Implemented
UD0370 # 01 Y:1992 01 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,775 $7,000 Not Implemented
UD0370 # 02 Y:1992 02 1992 RECOVER WASTE HEAT FROM EQUIPMENT $2,993 $500 Implemented
UD0370 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,643 $0 Not Implemented
UD0370 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $767 $500 Implemented
UD0371 # 01 Y:1992 01 1992 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,032 $300 Implemented
UD0371 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $473 $0 Implemented
UD0371 # 03 Y:1992 03 1992 HEAT WATER WITH EXHAUST HEAT $11,914 $47,000 Not Implemented
UD0371 # 04 Y:1992 04 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,388 $45,000 Implemented
UD0372 # 01 Y:1992 01 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,610 $0 Implemented
UD0372 # 02 Y:1992 02 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,103 $841 Not Implemented
UD0372 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $305 $6,008 Implemented
ND0019 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,236 $1,550 Not Implemented
ND0019 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,082 $1,170 Implemented
ND0019 # 03 Y:1992 03 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,160 $200 Implemented
ND0019 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $384 $400 Implemented
ND0020 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,557 $1,707 Not Implemented
ND0020 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,080 $400 Implemented
ND0020 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,675 $0 Not Implemented
ND0020 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,278 $250 Not Implemented
ND0020 # 05 Y:1992 05 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $232 $300 Implemented
ND0020 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $223 $400 Implemented
ND0020 # 07 Y:1992 07 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $101 $0 Not Implemented
UD0366 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,200 $0 Implemented
UD0366 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $582 $500 Implemented