IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0226 # 07 Y:2001 07 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,005 $1,000 Not Implemented
WV0226 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,542 $100 Implemented
WV0226 # 09 Y:2001 09 2001 RECOVER WASTE HEAT FROM EQUIPMENT $3,535 $6,000 Not Implemented
UD0632 # 05 Y:2001 05 2001 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $5,264 $0 Implemented
WV0225 # 14 Y:2001 14 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $1,001 $2,500 Implemented
UD0632 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $12 Not Implemented
WV0225 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,187 $2,058 Not Implemented
WV0225 # 04 Y:2001 04 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,177 $1,320 Implemented
WV0225 # 11 Y:2001 11 2001 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,221 $4,450 Not Implemented
WV0225 # 01 Y:2001 01 2001 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $720 $4,100 Not Implemented
WV0225 # 10 Y:2001 10 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $683 $250 Implemented
WV0225 # 12 Y:2001 12 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $699 $2,655 Not Implemented
WV0225 # 08 Y:2001 08 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $453 $44 Implemented
UD0632 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $94,812 $8,000 Implemented
WV0225 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $733 $104 Implemented
WV0225 # 05 Y:2001 05 2001 RECOVER WASTE HEAT FROM EQUIPMENT $674 $386 Implemented
UD0632 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $315 $435 Not Implemented
UD0632 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,400 $1,846 Not Implemented
WV0225 # 02 Y:2001 02 2001 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,690 $5,084 Not Implemented
WV0225 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,134 $528 Implemented
WV0225 # 07 Y:2001 07 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,519 $1,500 Not Implemented
UD0632 # 10 Y:2001 10 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $207 $300 Not Implemented
UD0632 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,355 $0 Not Implemented
UD0632 # 04 Y:2001 04 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,915 $0 Implemented
UD0632 # 02 Y:2001 02 2001 $33,500 $6,000 Not Implemented