IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

406

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0683 # 04 Y:2003 04 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,225 $0 Not Implemented
UD0683 # 06 Y:2003 06 2003 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $200 $0 Not Implemented
UD0683 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,720 $11,700 Implemented
UD0683 # 05 Y:2003 05 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $0 Not Implemented
UD0683 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $2,600 $4,625 Not Implemented
UD0683 # 01 Y:2003 01 2003 $30,335 $50,000 Not Implemented
UD0682 # 01 Y:2003 01 2003 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $27,674 $15,870 Not Implemented
UD0682 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,809 $47,488 Not Implemented
UD0682 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,062 $5,376 Not Implemented
UD0682 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $27,255 $5,000 Not Implemented
UD0682 # 09 Y:2003 09 2003 $2,596 $0 Implemented
UD0682 # 11 Y:2003 11 2003 INSTALL OCCUPANCY SENSORS $366 $428 Not Implemented
UD0682 # 07 Y:2003 07 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $4,800 $2,000 Implemented
UD0682 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,790 $3,000 Implemented
UD0682 # 03 Y:2003 03 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $21,300 $11,000 Not Implemented
UD0682 # 10 Y:2003 10 2003 DISCONNECT BALLASTS $1,534 $116 Not Implemented
UD0682 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,025 $1,000 Implemented
UD0680 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $9,824 $2,160 Not Implemented
UD0680 # 09 Y:2003 09 2003 OPTIMIZE PLANT POWER FACTOR $4,028 $5,000 Not Implemented
UD0680 # 11 Y:2003 11 2003 COVER OPEN TANKS $2,708 $1,375 Implemented
UD0680 # 12 Y:2003 12 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,465 $900 Implemented
UD0680 # 02 Y:2003 02 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,750 $1,460 Implemented
UD0680 # 13 Y:2003 13 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,815 $0 Implemented
UD0680 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,115 $0 Not Implemented
UD0680 # 10 Y:2003 10 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $3,078 $0 Implemented