IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0380 # 11 Y:2008 11 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,989 $1,550 Implemented
WV0380 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,058 $30 Implemented
WV0380 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $2,626 $1,018 Implemented
WV0380 # 08 Y:2008 08 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,853 $13,200 Not Implemented
WV0380 # 07 Y:2008 07 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,939 $1,690 Implemented
WV0380 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,106 $1,120 Not Implemented
WV0380 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $0 Implemented
WV0380 # 04 Y:2008 04 2008 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $6,055 $4,950 Not Implemented
WV0380 # 03 Y:2008 03 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,429 $3,300 Not Implemented
WV0380 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,037 $8,850 Implemented
WV0380 # 01 Y:2008 01 2008 OPTIMIZE PLANT POWER FACTOR $18,045 $7,420 Not Implemented
UD0786 # 11 Y:2008 11 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $303 $1,000 Implemented
UD0786 # 10 Y:2008 10 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $927 $140 Not Implemented
UD0786 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,154 $0 Implemented
UD0786 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $5,812 Not Implemented
UD0786 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,387 $1,280 Implemented
UD0786 # 05 Y:2008 05 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,446 $0 Implemented
UD0786 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,109 $9,240 Implemented
UD0786 # 03 Y:2008 03 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $8,467 $5,000 Implemented
UD0786 # 02 Y:2008 02 2008 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $16,751 $15,000 Implemented
UD0786 # 01 Y:2008 01 2008 AIR CONDITION ONLY SPACE NECESSARY $33,340 $66,680 Implemented
UD0785 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $66,859 $121,500 Implemented
UD0785 # 04 Y:2008 04 2008 COVER OPEN TANKS $13,767 $55,000 Not Implemented
UD0785 # 03 Y:2008 03 2008 REPLACE BOILER $54,105 $88,560 Not Implemented
UD0785 # 06 Y:2008 06 2008 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,484 $640 Not Implemented