IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

324

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0454 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,892 $4,500 Not Implemented
UM0454 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,354 $1,000 Not Implemented
UD0919 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,757 $0 Implemented
UD0919 # 02 Y:2015 02 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,792 $0 Implemented
UD0919 # 03 Y:2015 03 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,936 $50 Implemented
UD0919 # 04 Y:2015 04 2015 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $29,266 $9,200 Implemented
UD0919 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,602 $22,000 Not Implemented
UD0919 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,496 $2,295 Not Implemented
UD0919 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $11,674 $0 Implemented
UD0919 # 08 Y:2015 08 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,715 $0 Implemented
UD0919 # 09 Y:2015 09 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $4,591 $4,300 Not Implemented
UD0919 # 10 Y:2015 10 2015 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,652 $5,000 Not Implemented
UD0919 # 11 Y:2015 11 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $242 $700 Not Implemented
UD0919 # 12 Y:2015 12 2015 MAKE A NEW BY-PRODUCT $24,789 $46,000 Not Implemented
UD0919 # 13 Y:2015 13 2015 CLEAN FOULING FROM WATER LINES REGULARLY $5,080 $2,750 Not Implemented
UD0918 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,159 $700 Not Implemented
UD0918 # 02 Y:2015 02 2015 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,098 $0 Not Implemented
UD0918 # 03 Y:2015 03 2015 USE RADIANT HEATER FOR SPOT HEATING $4,208 $1,050 Not Implemented
UD0918 # 04 Y:2015 04 2015 DEVELOP A REPAIR/REPLACE POLICY $58,864 $75,499 Implemented
UD0918 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,325 $0 Implemented
UD0918 # 06 Y:2015 06 2015 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $11,416 $23,545 Not Implemented
UD0918 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,952 $45,000 Not Implemented
UD0918 # 08 Y:2015 08 2015 RECOVER WASTE HEAT FROM EQUIPMENT $3,773 $4,785 Implemented
UD0918 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $537 $1,000 Implemented